Copyright @ 2012. Bore Repair India, All rights reserved. Designed & Powered by Web Element, Inc

Services


Line Boring


STERNRAMP

This newly built Stern Ramp for a heavy lift ship required boring of hinges 17 numbers, over a distance of 21mtrs we bored all bores, ranging from 200 mm to 400mm as per manufacture’s drawing & achieved perfect bores sizes and piano wire line alignment. The line boring operation was conducted with great precision and we achieved a line accuracy of 0.2mm over 21meters, which was an achievement well within the desired line accuracy of 0.8mm.